Sunstone Metals (STM) Resources Rising Stars Gold Coast Conference summary
Event summary combining transcript, slides, and related documents.
Resources Rising Stars Gold Coast Conference summary
5 Oct, 2026Strategy and market context
Advancing two scalable, long-life gold-copper projects in Ecuador, targeting Tier 1 assets and value realization.
Ecuador offers low costs, USD currency and government support for responsible mining; recent major M&A highlights regional investment interest.
Record gold prices and copper demand driven by electrification and supply shortfalls support project economics.
Flagship assets and resource growth
Bramaderos has a 3.6Moz AuEq 2025 JORC Resource and a 5.0–12.9Moz AuEq exploration target; a significant resource upgrade is expected in late 2026.
Copete and Porotillo have a 1.7–3.5Moz exploration target; shallow holes were mineralized from surface to end of hole, with three averaging 0.6–0.7 g.
El Palmar has a 1.2Moz AuEq maiden JORC Resource and a 15–45Moz AuEq exploration target, with growth potential along the Toachi Fault.
Melonal drilling has extended mineralization south; its porphyry systems are viewed as interconnected and potentially part of a 2km by 2km open pit.
El Palmar is surrounded by major deposits and has multiple untested targets; two porphyry fingers extend upward from depth and meet near surface.
Operational and technical highlights
Drilling at Bramaderos' Copete-Porotillo and Limon continues to deliver fully mineralized holes; further Limon drilling is planned.
El Palmar drilling has defined three major targets, T1, T2 and T3; deep drilling indicates potential for higher copper grades.
Both projects have mineralization at surface, low strip ratios and potential for rapid resource expansion through ongoing drilling.
Projects benefit from low energy and labor costs and access to grid power and highways.
Latest events from Sunstone Metals
- Bramaderos reaches 6.2Moz AuEq as two Ecuador projects advance resource growth and deeper exploration.STM
Investor presentation - Bramaderos resource up 33% to 3.6Moz AuEq; strong funding supports ongoing exploration.STM
H2 2026 - Strong exploration results and new funding position the company for resource growth in Ecuador.STM
Q4 2026 TU - Major gold-copper projects in Ecuador advance with strong growth, low costs, and robust exploration.STM
Noosa Mining Conference 2026 - 23-year mine life, US$0.9B NPV, low costs, and major upside from resource growth.STM
Investor update - Resource growth in Ecuador, $2.3M loss, cash down to $2.7M, further capital raised for exploration.STM
H2 2024 - Resource upgrades and new discoveries drive growth, despite a $2.4M net loss in FY2025.STM
H2 2025 - Loss narrowed, cash up, and resource growth at key projects; future funding remains critical.STM
H1 2026 - Bramaderos resource up 33% to 3.6Moz AuEq; $8M raised, drilling to resume at key targets.STM
Q2 2026 TU