West Red Lake Gold Mines (WRLG) Corporate presentation summary
Event summary combining transcript, slides, and related documents.
Corporate presentation summary
10 Nov, 2026Strategy and execution
Madsen’s permitted mine and mill anchor a Red Lake hub-and-spoke plan, with high-grade Rowan ore trucked ~80 km to the mill from 2029.
Longer-term district ambition exceeds 150,000 oz of annual gold production, supported by exploration, resource growth and regional consolidation.
Commercial production began Jan. 1, 2026; revised 2026 guidance is 27,000–32,000 oz, with Madsen targeting 800 tpd by year-end.
Fork and the 904 Complex are scheduled to enter the production profile in 2027; Rowan development is planned to begin in 2029.
Madsen operating performance
Q1–Q3 2026 gold production totaled 22,102 oz; YTD mill throughput averaged 819 tpd and gold recovery averaged 95%.
Mill throughput increased 52% from Q1 to Q3 2026, reaching 867 tpd in Q3.
Shaft refurbishment and the 13 Level East Drive are intended to expand hoisting capacity and access additional mining fronts.
Integrated Madsen-Rowan plan
Integrated PFS after-tax NPV at 5% is C$764M at a base-case gold price of US$3,568/oz; mine life is 10 years with C$200M growth capex.
Plan projects 108 koz/year average production in 2029–2034, peaking at 119 koz in 2034; LOM recovered gold is ~884 koz.
LOM average cash cost is US$1,795/oz and AISC is US$2,457/oz; discounted payback is 2.2 years.
Rowan contributes ~500 tpd of high-grade feed from 2029; planned recovery is 97%, with blended mill throughput rising to 1,350 tpd in 2029–2034.
A 10% increase over the LOM average gold price of US$3,782/oz increases after-tax NPV by 31% to ~C$1.0B.
Latest events from West Red Lake Gold Mines
- Madsen-Rowan targets >100,000 oz/y from 2029, with growth potential to 150,000 oz/y.WRLG
Investor update - Ramp-up and expansion in Red Lake target 150,000 oz/year via multi-asset growth and consolidation.WRLG
Mining Forum Americas 2026 - Targeting 150,000+ oz/year gold output with strong growth from Madsen and Rowan projects.WRLG
Corporate presentation - Production ramp-up and resource expansion drive growth toward 150,000+ oz/year target.WRLG
Corporate presentation - Targeting 150,000+ oz/year gold production with scalable assets and strong growth in Red Lake.WRLG
Corporate presentation - Gold output, sales, and earnings soared in Q2 2026 as costs dropped and free cash flow rebounded.WRLG
Q2 2026 - Q1 2026 saw strong ramp-up, $41.8M revenue, and rising production outlook for H2.WRLG
Q1 2026 - 2026 production is ramping up, with costs set to decline and major growth catalysts ahead.WRLG
Investor update - 2026 gold output guidance set at 35,000–45,000 oz, targeting 300% growth by 2029.WRLG
Q4 2025