4 Nov, 2026Integrated PFS economics
Integrated Madsen-Rowan PFS targets >100,000 oz/y from 2029; estimated cumulative after-tax free cash flow >CAD 1bn and NPV ~CAD 764m.
Study uses a CAD 3,500/oz long-term gold price; a 10% gold-price increase was said to add >CAD 1bn to NAV and lift NAV ~31%.
Project CapEx is ~CAD 200m; includes Rowan development and Madsen mill, infrastructure and tailings work.
AISC is estimated at CAD 2,400–2,500/oz; management said the updated estimate reflects operating experience and a shift to long-hole open stoping.
Production and mine plan
Madsen production is planned to ramp through 2027–28; Rowan is expected to start production in late 2029.
Rowan plan grows from 35,000 oz/y in the prior PEA to 50,000 oz/y; diluted grades cited at ~9 g/t for Rowan and ~6 g/t for Madsen.
Combined operating grade is ~6.8–7 g/t; management expects production to average ~100,000 oz/y from 2029 onward.
Mill is designed to expand to 1,350 tpd with limited CapEx; permitting work is also targeting flexibility up to 1,500 tpd.
Rowan construction is targeted to start around mid-2028, with production planned for 2029; permitting work is underway.
Reserves and growth potential
Integrated reserves are just under 1 Moz at ~6.8 g/t Au, ~85% higher than the prior PFS; Rowan contributes >300,000 oz of first-time reserves.
Mine life is 10 years, compared with ~8.5 years in the prior Madsen PFS; ~65,000 m of drilling completed since the reserve/resource cutoff was excluded.
Management sees a pathway to 150,000 oz/y through Madsen, Rowan and nearby deposits, with growth largely using existing facilities and potentially funded from cash flow.
Further opportunities include Madsen’s Fork, Wedge and West deposits, plus Rowan-area Mount Jamie and Red Summit; several are outside the study plan.
Latest events from West Red Lake Gold Mines
- Madsen and Rowan reserves underpin a 108 koz/year growth plan from 2029.WRLG
Corporate presentation - Ramp-up and expansion in Red Lake target 150,000 oz/year via multi-asset growth and consolidation.WRLG
Mining Forum Americas 2026 - Targeting 150,000+ oz/year gold output with strong growth from Madsen and Rowan projects.WRLG
Corporate presentation - Production ramp-up and resource expansion drive growth toward 150,000+ oz/year target.WRLG
Corporate presentation - Targeting 150,000+ oz/year gold production with scalable assets and strong growth in Red Lake.WRLG
Corporate presentation - Gold output, sales, and earnings soared in Q2 2026 as costs dropped and free cash flow rebounded.WRLG
Q2 2026 - Q1 2026 saw strong ramp-up, $41.8M revenue, and rising production outlook for H2.WRLG
Q1 2026 - 2026 production is ramping up, with costs set to decline and major growth catalysts ahead.WRLG
Investor update - 2026 gold output guidance set at 35,000–45,000 oz, targeting 300% growth by 2029.WRLG