Company Presentation
Logotype for Xanadu Mines Limited

Xanadu Mines (XAM) Company Presentation summary

Event summary combining transcript, slides, and related documents.

Logotype for Xanadu Mines Limited

Company Presentation summary

6 Jun, 2025

Project overview and strategic positioning

  • Kharmagtai is a large-scale copper-gold porphyry system in Mongolia, 120km from Oyu Tolgoi, with a 30-year mining license and potential for a 40-year extension.

  • Mongolia offers a stable mining jurisdiction, strong infrastructure, and proximity to China, the top global copper consumer.

  • Xanadu Mines leverages deep local expertise and operates to high ESG standards.

Resource and reserve highlights

  • 2024 resource estimate: 2.2Bt at 0.21% Cu and 0.15g/t Au, totaling 4.7Mt copper and 11Moz gold.

  • Ore reserve: 730Mt at 0.21% Cu and 0.17g/t Au (1.6Mt copper, 4Moz gold), all classified as probable.

  • Strong growth potential remains at depth and along strike.

Pre-feasibility study and economics

  • PFS completed October 2024, confirming a 29-year LOM with average annual output of 75kt copper and 165koz gold.

  • Post-tax NPV: US$930M, IRR: 21%, payback: 4 years, pre-production capex: US$890M.

  • First quartile C1 cash cost: $0.70/lb copper for Stage 1.

  • Open pit, low strip ratio, conventional flotation plant with gravity and CIL for gold recovery.

Partial view of Summaries dataset, powered by Quartr API
AI can get things wrong. Verify important information.
All investor relations material. One API.
Learn more