Zimplats (ZIM) Q1 2027 TU earnings summary
Event summary combining transcript, slides, and related documents.
Q1 2027 TU earnings summary
27 Oct, 2026Executive summary
No lost-time injuries; mined volumes fell 5% QoQ and 1% YoY, while 6E metal in concentrate declined 5% QoQ and rose 3% YoY.
6E head grade was stable QoQ and YoY; milled volumes fell 4% QoQ and increased 2% YoY.
Financial highlights
Total operating costs were US$173.7M, down 16% QoQ and up 7% YoY; lower power use during furnace maintenance and reduced engineering maintenance drove the QoQ decline.
Cash costs of metal produced were US$155.3M, down 36% QoQ and up 2% YoY.
Outlook and guidance
Furnace maintenance began 1 September, with a return to operation scheduled by end-October 2026; accumulated concentrate inventory is expected to be smelted during the remainder of FY2027.
Mupani Mine remains on track for full capacity of 3.6M tonnes per annum by FY2029; the Phase 2A solar project is expected to complete commissioning in Q2 FY2027, lifting solar generation to 80MW.
Latest events from Zimplats
- PGM price strength drove a profit rebound as mine renewal and energy security remain priorities.ZIM
H2 2026 - 6E metal output surged 179% sequentially as costs rose and key projects advanced on schedule.ZIM
Q4 2026 TU - Final metal output plunged on smelter downtime, raising costs, while key projects advanced.ZIM
Q3 2026 TU - Production up, profit down as PGM prices fell; major projects and cost controls advanced.ZIM
H2 2024 - Revenue up 8% to US$826.6m, profit after tax US$40.5m, major projects commissioned.ZIM
H2 2025 - Net profit surged 3,376% year-over-year on strong metal prices and higher sales volumes.ZIM
H1 2026 - 6E metal output dropped 24% on higher costs, while major expansion projects advanced.ZIM
Q1 2026 TU - 6E head grade and mined volumes rose, but final product output fell amid smelter ramp-up.ZIM
Q1 2025 - Operating cash costs fell 4% year-over-year as production and capital projects progressed.ZIM
Q4 2024