)
Aura Energy (AEE) investor relations material
Aura Energy Investor presentation summary
Complete event summary combining all related documents: earnings call transcript, report, and slide presentation.Tiris project and economics
2026 BFS targets first ore by end-2028 after about two years of construction; 46.1 Mlb saleable U3O8 over a 26-year mine life, averaging 1.8 Mlb/year.
At US$90/lb, post-tax NPV8 is US$500.3M on a 100% ungeared basis, with 28% IRR and 3.2-year payback from first production.
Development capital is US$349.8M; C1 cash cost is US$32.53/lb and AISC US$41.25/lb. Life-of-mine capital totals US$573.3M, including closure.
Ore Reserve increased 11% to 37.3 Mlb; the production schedule uses 67.1% Ore Reserves and 32.9% Inferred Resources by ore tonnes.
Inferred material is under 12% of ore mined in the first five years and under 25% in the first ten; the project plans infill drilling ahead of later mining, with no certainty of conversion.
Mine and processing design
Shallow, free-dig ore typically sits 6–8 m below surface; no blasting, crushing or grinding is required, with a 1.00:1 waste-to-ore ratio.
Screening sends 91.9% of uranium into about 12% of feed mass, producing leach feed averaging 1,697 ppm U3O8; overall recovery from run-of-mine ore to final product is 83.7%.
A central leach plant is supplied by two relocatable beneficiation plants; the 550 ktpa leach circuit is the operation’s throughput constraint.
The BFS assumes an 85% renewable solar-and-battery microgrid, 13 MW peak load and US$0.15/kWh power price; a power purchase agreement is expected in Q1 2027.
Funding and execution
The US$400M funding plan assumes US$220M debt and US$180M equity or quasi-equity; discussions with the US DFC cover US$150–170M of senior debt.
Funding is not secured and no lender or investor has committed; the final funding mix remains undetermined, and equity or quasi-equity may substantially dilute shareholders.
A pilot plant using real ore is scheduled to run from November 2026, testing the full flowsheet; the board’s FID decision is targeted for December 2026.
Principal Mauritanian approvals are granted; remaining routine water, power, transport and export permits are expected through 2027.
Construction is planned to start in Q1 2027, with first ore by end-2028 and nameplate production targeted for 2030.
- Tiris advances toward FID with a US$500.3m BFS NPV and 2.04 quarters of cash runway.AEE
Q1 2027 TU - Tiris pilot plant construction and key offtake deals mark progress amid narrowed losses and strong cash.AEE
H2 2026 - Tiris project advances toward production with strong cash reserves and supportive uranium market.AEE
Q4 2026 TU - Tiris and Häggån projects drive near-term uranium growth and leverage global energy transition.AEE
Investor presentation - Tiris project targets 2027 uranium production with 91.3Mlbs resources and strong growth prospects.AEE
Investor presentation - Over 900Mlbs uranium resources, near-term production, and strong market outlook drive growth.AEE
Investor presentation - Tiris resource upgrade and permitting drive project value; cash supports next-stage development.AEE
Q4 2024 TU - Tiris Uranium Project advanced to construction-ready status with major resource and funding milestones.AEE
H2 2024 - Tiris Uranium Project advances to FID with robust economics and full permitting secured.AEE
Q1 2025 TU
Next Aura Energy earnings date
Next Aura Energy earnings date
AI chat
Ask anything. Verify everything.
Ask across every event and document from public companies. Each answer links back to the exact line in the transcript, slide or filing it came from.Learn moreFind what matters
AI across all first-party IR material. Live calls, transcripts, slides, filings.)
Trust every finding
50m+ first-party documents. Every output traceable to its source.Automations
Zero in on what matters
Define the prompt once. It runs the moment a company publishes or on a schedule you set. Outputs map to the exact signals you choose.Learn more)
Event-triggered research
Runs when a company publishes new material. Trigger on the first published document for the earliest possible run, or wait for a specific one.)
Scheduled research
Runs on a recurring cadence you set. Daily, weekly, monthly, or quarterly, for aggregate reads across a period rather than a single event.Live audio & transcripts
Be first
Join any earnings call live in one click, with no manual registration. Follow the transcript as it happens and jump straight to the moments that matter.Learn more)
Live earnings calls
Join any call in one click. The audio keeps playing while you work elsewhere in Quartr.)
Live transcripts
Speaker-by-speaker, in real time. Searchable across every live and historical call.Quartr MCP connects your AI environment to 17K+ public companies
Quartr's AI stands out because it only pulls clean, first-party data from public companies. In investing, that's everything.
Jamie Ross
Investment Manager, GAM Investments
Research that used to take hours now takes seconds with Quartr Pro. Tracking shifts in tone or extracting tables, it's as simple as typing a query.
Tom O'Hara
Investment Director
Before Quartr we spent hours manually compiling insights through the peer earnings cycle. Now, these tasks are done faster, with greater precision.
Gregg Lampf
VP of Investor Relations
Being able to ask specific questions across years of transcripts and reports and instantly get verified answers is a game-changer.
Pontus Dackmo
CEO & Investment Manager
)
)
)
)