Resources Rising Stars Gold Coast Conference
Logotype for FireFly Metals Ltd

FireFly Metals (FFM) Resources Rising Stars Gold Coast Conference summary

Event summary combining transcript, slides, and related documents.

Logotype for FireFly Metals Ltd

Resources Rising Stars Gold Coast Conference summary

9 Sep, 2026

Resource update and project scale

  • Resource increased to 84 million tonnes at 2.5% copper equivalent, with a high-grade core of 25 million tonnes at 4.3% copper equivalent.

  • 72% of the resource is in the measured and indicated category, indicating high confidence.

  • Project targets production of up to 100,000 tonnes copper equivalent per year, aiming for first production before end of 2029.

  • Ongoing drilling with nine rigs is expanding the resource, which is expected to reach at least 100 million tonnes.

  • The ore body remains open at depth, with recent drilling returning 49 m at 6.1% copper equivalent.

Economic studies and financials

  • Preliminary studies show a base case NPV of AUD 2.2 billion and an upscaled case NPV of AUD 3 billion, both at conservative copper prices.

  • Base case delivers 50,000 tonnes annual production over 14 years, with a 32-year mine life and 41% IRR.

  • Upscaled scenario targets 100,000 tonnes annual production for six years, with potential to extend through further drilling.

  • Post-tax cash flow projected at AUD 5.4 billion (base) and over AUD 6.5 billion (upscale), with rapid payback periods.

  • Current cash reserves of AUD 373 million, strong institutional support, and additional funding offers ensure project financing.

Operational advantages and infrastructure

  • Located in Newfoundland, a supportive jurisdiction with existing environmental permits and strong community backing.

  • Infrastructure includes a port 5 km away and access to low-cost hydropower at AUD 0.065/kWh.

  • Mining methods are industry standard, with high metallurgical recoveries: over 98% for copper, 80% for gold, and 85% for silver.

  • Detailed mine design and scheduling support robust production and economic projections.

Partial view of Summaries dataset, powered by Quartr API
AI can get things wrong. Verify important information.
All investor relations material. One API.
Learn more