Lithium Americas (LAC) Q3 2026 earnings summary
Event summary combining transcript, slides, and related documents.
Q3 2026 earnings summary
12 Nov, 2026Executive summary
Q3 2026 net income was $90.1M, including $74.7M attributable to stockholders, versus a $199.2M net loss; non-cash fair-value gains drove the year-over-year swing.
Thacker Pass Phase 1 construction continued toward mechanical completion in late 2027, with production ramp-up through 2028; the revised capex estimate is $3.83B, up from $2.93B.
Financial highlights
9M 2026 net income was $96.4M, including $76.4M attributable to stockholders, versus net losses of $223.9M and $220.8M, respectively, in 9M 2025.
Q3 fair-value gains included $53.6M on the JV Warrant and $39.3M on the Orion embedded derivative; 9M gains were $63.5M and $59.3M, respectively.
Q3 basic EPS was $0.19 versus a loss of $0.83; 9M basic EPS was $0.21 versus a loss of $0.98. Diluted EPS was a loss of $0.05 in Q3 and $0.13 for 9M 2026.
9M operating cash use was $21.1M; investing cash use was $1.039B, principally for construction, and financing cash provided was $1.413B.
Outlook and guidance
The $995M incremental funding need comprises $895M of capex, $58M of reserve requirements and $42M net across other items; expected sources are $650M of JV contributions and $315M in DOE loan reserve accounts.
FY 2026 Phase 1 capex guidance is $1.7B–$2.0B, with peak spending expected in 2026 and remaining expenditure through 2027; ramp-up is planned through 2028.
Phase 1 mechanical completion remains targeted for late 2027, followed by ramp-up through 2028; the Transload Terminal is targeted for completion in 2027.
No operating revenue is expected before production begins; operating losses and negative operating cash flows are expected during development.
Latest events from Lithium Americas
- Late-2027 completion target, $3.83B capex estimate and expansion potential to 160,000 t/y.LAC
Corporate presentation - Positive earnings and strong liquidity support Thacker Pass construction toward late 2027 completion.LAC
Q2 2026 - Thacker Pass is set to deliver major U.S. lithium capacity with full funding and rapid construction progress.LAC
Corporate presentation - Thacker Pass is set to boost U.S. lithium supply with fully funded, large-scale production by 2028.LAC
Corporate presentation - Q1 2026 marked a return to profit, strong liquidity, and rapid Thacker Pass project advancement.LAC
Q1 2026 - Shareholders to vote on board size, director elections, and auditor appointment at the annual meeting.LAC
Proxy filing - 2025 marked pivotal progress at Thacker Pass, with robust governance and performance-driven compensation.LAC
Proxy filing - Shareholders to vote on Board, auditor, and expanded equity plan after a transformative year.LAC
Proxy filing - Thacker Pass construction advances with strong funding and workforce ramp-up to meet U.S. lithium demand.LAC
Q2 2025