Investor presentation
Logotype for Mayfair Gold Corp

Mayfair Gold (MFG) Investor presentation summary

Event summary combining transcript, slides, and related documents.

Logotype for Mayfair Gold Corp

Investor presentation summary

16 Mar, 2026

Strategic development approach

  • Focus on unlocking value from a 4.3 Moz indicated gold resource at Fenn-Gib, with a strategic path to production emphasizing accelerated provincial permitting and lower capital requirements for reduced execution risk.

  • Targeting high-margin material for improved payback and the quickest path to free cash flow in the current gold cycle, enabling reinvestment opportunities.

  • Project located in the prolific Timmins gold district with excellent infrastructure, workforce access, and proximity to established producers.

  • Management team with a proven track record in advancing assets to production and significant insider ownership (~35%).

Project economics and financial highlights

  • 2026 PFS outlines a 1 Moz reserve at US$3,100/oz gold, with optionality on 3.3 Moz not mined in the PFS.

  • LOM average annual gold production of 64,096 oz at 1.29 g/t, with LOM average AISC of US$1,292/oz and C$1.7B cumulative free cash flow.

  • Initial capex of C$450M, payback in 2.7 years, after-tax NPV (5%) of C$652M, and IRR of 24% at base case gold price.

  • Spot gold scenario (US$4,450/oz) increases after-tax NPV (5%) to C$1.4B, IRR to 38%, and reduces payback to 1.7 years.

  • Sensitivity analysis shows strong leverage to gold price, with NPV and IRR rising significantly at higher gold prices.

Operational and technical details

  • Project designed for <5,000 tpd throughput, enabling a streamlined permitting process and reduced execution risk.

  • Modular construction and shorter construction period (<2 years) further mitigate inflation and execution risks.

  • High-grade core targeted, with first six years averaging 71,336 oz/year at 1.47 g/t.

  • Metallurgical testwork supports a conventional flowsheet with 90% gold recovery for 1.5 g/t head grade.

  • Plant design includes three-stage crushing, ball mill grinding, flotation, CIL, and cyanide detoxification.