2026 Precious Metals Summit Zurich
Logotype for Orvana Minerals Corp

Orvana Minerals (ORV) 2026 Precious Metals Summit Zurich summary

Event summary combining transcript, slides, and related documents.

Logotype for Orvana Minerals Corp

2026 Precious Metals Summit Zurich summary

10 Nov, 2026

Portfolio overview

  • Three assets across Spain, Bolivia and Argentina: Spain in continuous gold-copper production since 2011, Bolivia restarted production in 2026, and Taguas in Argentina is an exploration-stage gold-copper project.

  • Land packages across all three assets support exploration and potential mine-life growth.

Spain operations

  • Underground gold-copper production at El Valle and satellite Carlés; FY2025 output was 38,000 oz gold and 2.9 million lb copper.

  • More than 30,000 hectares of land; exploration near the plant targets new deposits and extensions to existing deposits to extend mine life.

Bolivia restart and expansion

  • Production restarted in 2026, processing stockpiles through a new acid-leach, filtration and electrowinning circuit for copper cathodes; remaining material enters CIL for gold-silver doré.

  • Ramp-up underway, with design capacity of 1,700 t/d targeted by end-December 2026; stockpile contains 129,000 oz gold and 41,000 tonnes copper.

  • Around 8 million tonnes of tailings plus stockpiles could support a 6–7-year mine life; exploration and evaluation of remnant zones are resuming.

Partial view of Summaries dataset, powered by Quartr API
AI can get things wrong. Verify important information.
All investor relations material. One API.
Learn more

Latest events from Orvana Minerals