Orvana Minerals (ORV) Mining Forum Americas 2026 summary
Event summary combining transcript, slides, and related documents.
Mining Forum Americas 2026 summary
28 Sep, 2026Operational highlights
Three mining units in Spain, Bolivia, and Argentina, each with significant land packages and exploration potential.
Share price increased from CAD 0.60 to CAD 2.6 over the past year, reflecting improved production and exploration results.
Market cap stands at CAD 360 million, with an enterprise value of $320 million.
Spain operations have produced copper concentrate and gold/silver doré bars, with 2025 output at 30,000 oz gold and 3.5 million lbs copper; 2026 guidance is above 35,000 oz gold.
Spain's land package in Asturias totals 30,000 hectares, enabling acquisition of four new permits.
Bolivia project update
Production resumed in 2026 after a seven-year hiatus, leveraging a 2 million ton oxide stockpile containing 130,000 oz gold and 41,000 tons copper.
New acid leaching circuit constructed to process stockpile, with a three-year project timeline.
Exploration to extend mine life is ongoing, with over 33,000 hectares and two mineralized belts identified.
Additional opportunity exists in 8 million tons of tailings with gold and copper content, with metallurgical testing underway.
Argentina (Taguas) exploration strategy
Taguas project in San Juan province expanded to 7,000 hectares after acquiring the Evelina property.
Initial focus was on oxide resources, with a 2021 PEA based on open pit, heap leach operation at $1,700/oz gold.
Recent strategy shift to explore deeper porphyry potential, supported by geophysical surveys and deep drilling.
First deep drill hole intercepted porphyry mineralization at 700–900 meters, with 0.25 g/t gold and 0.12% copper.
2026 exploration budget of CAD 15 million targets integration of Evelina, expanded geophysics, infill drilling for oxides, and 10,000 meters of deep drilling.
Latest events from Orvana Minerals
- Strong Q3 FY2026 results and ramp-up at Don Mario drive growth across a diversified asset base.ORV
Corporate presentation - Revenue and net income rose, with Bolivia ramping up and Argentina expanding exploration.ORV
Q3 2026 - Strong Q2 FY2026 results with higher revenue, net income, and positive free cash flow.ORV
Q2 2026 - FY2027 targets 65k oz gold and 19M lbs copper, with growth driven by all three core assets.ORV
Corporate presentation - Bolivian ramp-up and Argentina exploration set to transform gold and copper output this year.ORV
Mining Forum Europe 2026 - Production rebounded in Spain, Bolivian restart advanced, and FY2026 guidance reaffirmed.ORV
Q1 2026 - Revenue rose in FY2025 as Spain remained stable and Bolivia's Don Mario expansion advanced.ORV
Q4 2025 - Q3 results improved on higher production and prices; Don Mario financing advances for expansion.ORV
Q3 2024 - Production fell 22% in FY2024, but Bolivia project funding and construction advanced.ORV
Q4 2024