8 Oct, 2026Indian power market and capacity strategy
India is projected to grow 6.4% in 2026, the fastest among major economies; installed power capacity is expected to reach 549 GW by June 2026, with per capita electricity consumption set to rise.
Revised capacity targets are 150 GW by FY 2032 and 250 GW by FY 2037, versus a portfolio of ~127 GW: ~91 GW operational and ~36 GW under construction; additions were 9.6 GW in FY 2026 and 1.9 GW in FY 2027 to date.
Fossil-fuel capacity share is projected to decline from 82% to 56% by FY 2032 and 39% by FY 2037; renewables’ generation share is targeted to reach ~33% by FY 2037, from 4%.
Planned CapEx through FY 2037 is INR 16.86 lakh crore, with 43% allocated to renewables; INR 597,000 crore is planned for FY 2028–FY 2032 and INR 963,000 crore for FY 2033–FY 2037.
Peak demand has crossed 270 GW and is projected to exceed 450 GW by FY 2036; generation share is ~24% against 17% of installed capacity.
Energy transition and new businesses
Renewable capacity targets are 60 GW by FY 2032 and 136 GW by FY 2037, from 12 GW operational; FY 2027 additions of 7–8 GW are conditional on transmission availability.
Storage pipeline includes 38.9 GWh of BESS, with 6.62 GWh under execution and 30.4 GWh of non-solar-hour projects under development; 18.6 GWh has been tendered.
Pumped-storage ambition exceeds 80 GW; 13.2 GW of projects have been allocated, while an 18 GW portfolio is at various stages. Targets include 3–5 GW by FY 2033 and nearly 6 GW by FY 2037.
Nuclear ambition is 30 GW by FY 2047; the 2.8 GW Mahi Banswara project has approvals, and 34 sites are being explored.
Pudimadaka green hydrogen hub spans 1,200 acres with envisaged investment of ~INR 1 lakh crore; coal gasification is under development for synthetic natural gas and chemicals.
Operational performance and energy security
Coal stations achieved 72.04% PLF in FY 2026; forced outage rate improved from 3.9% to ~3.75%, and FY 2026 coal imports were zero.
Captive mines produced 48.66 million tons in FY 2026, meeting 18% of coal needs; the target is 25% by FY 2030, with 100% coal supply tied up through long-term agreements and captive mines.
Trade receivables were fully realized in FY 2026; receivable days fell from 31 to 15.
5 GWh of BESS is planned alongside thermal plants under regulated tariffs to shift daytime energy to evening demand; thermal units face a 55% technical minimum, prompting consideration of flexible smaller units and storage.
Latest events from NTPC
- Capacity targets exceed 130 GW by 2032, led by renewables and regulated thermal growth.NTPC
Investor Day 2024 - Capacity reached 90,904 MW as Q1 profits grew and a 35.7 GW construction pipeline advanced.NTPC
Q1 26/27 - PAT, capacity, and capex rose YoY; interim dividends declared; renewables and receivables improved.NTPC
Q3 25/26 - Capacity up 10% YoY, profit rises, and clean energy investments drive long-term growth.NTPC
Q2 2026 - INR 7 lakh crore backs a 149 GW vision spanning thermal and clean energy growth.NTPC
Investor Day 2025 - Standalone profit up 6% to ₹4,775 crore; capacity and renewables investments accelerate.NTPC
Q1 25/26 - Group PAT up 13% YoY, robust margins, interim dividend declared, and strong RE growth.NTPC
Q2 24/25 - FY25 net profit rose 12% to ₹23,953 crore, with record renewables and strong expansion targets.NTPC
Q4 24/25 - Q3 FY25 delivered robust growth with higher revenue, profit, and major renewable capacity expansion.NTPC
Q3 24/25