Investor Presentation
Logotype for Silver Mines Limited

Silver Mines (SVL) Investor Presentation summary

Event summary combining transcript, slides, and related documents.

Logotype for Silver Mines Limited

Investor Presentation summary

7 Sep, 2025

Corporate overview and capital structure

  • Board includes a non-executive chairman, managing director, and two non-executive directors.

  • 2,128.5 million shares on issue, with a share price of $0.145 as of 5 September 2025.

  • Undiluted market capitalization is $308.6 million AUD, with $19.3 million cash at end of June 2025.

  • Enterprise value stands at $289.3 million AUD.

  • Recent fundraising included a placement and SPP to raise $33 million.

Bowdens Silver Project highlights

  • Largest silver development project in Australia, 100% owned and located in NSW.

  • Mineral Resource base of 180Moz silver (334Moz AgEq) and Ore Reserve of 71.7Moz.

  • 16.5-year mine life with 2Mtpa plant, producing a single high-grade silver concentrate.

  • Pre-production capex of A$331 million, LOM AISC forecasted at <A$25/oz.

  • Over 85% of revenue expected from silver, with significant leverage to silver price.

Project economics and operating metrics

  • LOM operating margin of A$948 million and pre-tax NPV5 of A$359 million.

  • Payback period estimated at 3.9 years, profitability index of 1.76x.

  • Average output of 4.25Moz Ag per annum in the first 10 years.

  • LOM strip ratio of 1.49:1, open pit mining cost of A$7.12/t, processing cost of A$20.78/t.

  • Tailings dewatered for dry stacking, reducing water loss and site disturbance.

Partial view of Summaries dataset, powered by Quartr API
AI can get things wrong. Verify important information.
All investor relations material. One API.
Learn more